Storage & Installation
Storage and installation should not be carried out in rooms with a relative humidity greater than 70%, unless otherwise stated, see section Moisture . It is equally important to take account of other work such as technical installations before installation of the ceiling is carried out. It is important for the end result that the ceiling tiles are installed at right-angles, this also makes installation quicker & easier. It will also be easier to carry out inspections to installations above the ceiling as removal of the tiles will be easier. It is not recommended that ceilings are installed at a temperature consistantly over 50°C.
Layout
Generally start setting out from the centre of the room. The Combipanels are installed directly on a levelled substructure max. 1000 mm c/c.
Installation
Begin the first row of Combipanels in a corner of the room with the groove of the panels facing the room. Along the wall screw fixing shall be trough the panel. Along the wall a 22 mm distance furring shall be added. The enclosed metal S-profile shall be placed into the groove, and screw fixing take place trough the holes in the profile only.
The S-profile
The enclosed s-shaped metal profile shall be placed staggered to the end joints of the panels. Screw fixing at max 1000 mm c/c.
End row
For the last row of Combipanels a 22 furring along the wall shall be fixed. The last row of panels are screw fixed direct trough the panels into the furring.